MIDAS GEN background

MIDAS GEN

主要機能

Discover the main features of MIDAS GEN.Explore the product's core features through a variety of content.

    Features

    • Design Features
      Design Features
    • Wind & Seismic Loads auto-generation
      Wind & Seismic Loads auto-generation
    • High-rise Specific Functionality
      High-rise Specific Functionality
    • High-end Analysis Capabilities
      High-end Analysis Capabilities
    • Intuitive User Interface
      Intuitive User Interface
    • General Structural Analysis and Optimal Design System
      General Structural Analysis and Optimal Design System

    Features

    • Design Features
      Design Features
    • Wind & Seismic Loads auto-generation
      Wind & Seismic Loads auto-generation
    • High-rise Specific Functionality
      High-rise Specific Functionality
    • High-end Analysis Capabilities
      High-end Analysis Capabilities
    • Intuitive User Interface
      Intuitive User Interface
    • General Structural Analysis and Optimal Design System
      General Structural Analysis and Optimal Design System

    Modeling

    • File Manipulation
      File Manipulation
    • Modules for Multi-tower Buildings
      Modules for Multi-tower Buildings
    • Section Property Calculator
      Section Property Calculator
    • Semi-rigid Diaphragm
      Semi-rigid Diaphragm
    • Structure Wizards
      Structure Wizards
    • Walk Through Effect
      Walk Through Effect

    Modeling

    • File Manipulation
      File Manipulation
    • Modules for Multi-tower Buildings
      Modules for Multi-tower Buildings
    • Section Property Calculator
      Section Property Calculator
    • Semi-rigid Diaphragm
      Semi-rigid Diaphragm
    • Structure Wizards
      Structure Wizards
    • Walk Through Effect
      Walk Through Effect

    Loads

    • Static Wind and Seismic Loads
      Static Wind and Seismic Loads
    • Floor Loads
      Floor Loads
    • Dynamic Loads
      Dynamic Loads
    • Hydrostatic Pressure Loads
      Hydrostatic Pressure Loads

    Loads

    • Static Wind and Seismic Loads
      Static Wind and Seismic Loads
    • Floor Loads
      Floor Loads
    • Dynamic Loads
      Dynamic Loads
    • Hydrostatic Pressure Loads
      Hydrostatic Pressure Loads

    Analysis

    • Construction Stage Analysis
      Construction Stage Analysis
    • Floor Vibration Analysis
      Floor Vibration Analysis

    Analysis

    • Construction Stage Analysis
      Construction Stage Analysis
    • Floor Vibration Analysis
      Floor Vibration Analysis

    Finite Element Library

    • Pushover Analysis
      Pushover Analysis
    • Inelastic Time History Analysis
      Inelastic Time History Analysis
    • Boundary Nonlinear Time History Analysis
      Boundary Nonlinear Time History Analysis
    • Material Nonlinear Analysis/Plasticity Analysis
      Material Nonlinear Analysis/Plasticity Analysis
    • Heat of Hydration Analysis
      Heat of Hydration Analysis
    • Geometric Nonlinear Analysis
      Geometric Nonlinear Analysis
    • Structural Masonry Analysis
      Structural Masonry Analysis

    Finite Element Library

    • Pushover Analysis
      Pushover Analysis
    • Inelastic Time History Analysis
      Inelastic Time History Analysis
    • Boundary Nonlinear Time History Analysis
      Boundary Nonlinear Time History Analysis
    • Material Nonlinear Analysis/Plasticity Analysis
      Material Nonlinear Analysis/Plasticity Analysis
    • Heat of Hydration Analysis
      Heat of Hydration Analysis
    • Geometric Nonlinear Analysis
      Geometric Nonlinear Analysis
    • Structural Masonry Analysis
      Structural Masonry Analysis

    Results

    • Dynamic Report Generator
      Dynamic Report Generator
    • Beam Detail Analysis
      Beam Detail Analysis
    • Post-Processing
      Post-Processing

    Results

    • Dynamic Report Generator
      Dynamic Report Generator
    • Beam Detail Analysis
      Beam Detail Analysis
    • Post-Processing
      Post-Processing

    Meshed Slab

    • Mesh Generation
      Mesh Generation
    • Auto-mesh Function
      Auto-mesh Function
    • United Analysis Support
      United Analysis Support
    • Meshed Slab and Wall Design
      Meshed Slab and Wall Design
    • Wood Armer Moment
      Wood Armer Moment
    • Slab/Mat/Wall/Shell Design
      Slab/Mat/Wall/Shell Design
    • Various Application
      Various Application
    • Transfer Plate, Mat Foundation
      Transfer Plate, Mat Foundation
    • Special Structure
      Special Structure

    Meshed Slab

    • Mesh Generation
      Mesh Generation
    • Auto-mesh Function
      Auto-mesh Function
    • United Analysis Support
      United Analysis Support
    • Meshed Slab and Wall Design
      Meshed Slab and Wall Design
    • Wood Armer Moment
      Wood Armer Moment
    • Slab/Mat/Wall/Shell Design
      Slab/Mat/Wall/Shell Design
    • Various Application
      Various Application
    • Transfer Plate, Mat Foundation
      Transfer Plate, Mat Foundation
    • Special Structure
      Special Structure

    Capacity Design

    • RC Design
      RC Design
    • Concrete Frame, Slab, Wall Design
      Concrete Frame, Slab, Wall Design
    • Ductile Design / Strong Column Weak Beam
      Ductile Design / Strong Column Weak Beam
    • SRC / Footing Design
      SRC / Footing Design
    • Supported Section & Code Type
      Supported Section & Code Type
    • Composite Section for Construction Stage
      Composite Section for Construction Stage
    • Steel Frame
      Steel Frame
    • Optimal Design : Strength / Displacement
      Optimal Design : Strength / Displacement
    • Cold-formed Steel Design
      Cold-formed Steel Design

    Capacity Design

    • RC Design
      RC Design
    • Concrete Frame, Slab, Wall Design
      Concrete Frame, Slab, Wall Design
    • Ductile Design / Strong Column Weak Beam
      Ductile Design / Strong Column Weak Beam
    • SRC / Footing Design
      SRC / Footing Design
    • Supported Section & Code Type
      Supported Section & Code Type
    • Composite Section for Construction Stage
      Composite Section for Construction Stage
    • Steel Frame
      Steel Frame
    • Optimal Design : Strength / Displacement
      Optimal Design : Strength / Displacement
    • Cold-formed Steel Design
      Cold-formed Steel Design

    Seismic Design

    • Response Spectrum
      Response Spectrum
    • Eigenvalue Analysis
      Eigenvalue Analysis
    • Response Spectrum Analysis
      Response Spectrum Analysis
    • Pushover Analysis
      Pushover Analysis
    • Performance Point Calculation
      Performance Point Calculation
    • Pushover Hinge for Various Member Types
      Pushover Hinge for Various Member Types
    • Inelastic Time History Analysis
      Inelastic Time History Analysis
    • Inelastic Hinge Property Type
      Inelastic Hinge Property Type
    • Seismic Device (Damper/ Isolator)
      Seismic Device (Damper/ Isolator)

    Seismic Design

    • Response Spectrum
      Response Spectrum
    • Eigenvalue Analysis
      Eigenvalue Analysis
    • Response Spectrum Analysis
      Response Spectrum Analysis
    • Pushover Analysis
      Pushover Analysis
    • Performance Point Calculation
      Performance Point Calculation
    • Pushover Hinge for Various Member Types
      Pushover Hinge for Various Member Types
    • Inelastic Time History Analysis
      Inelastic Time History Analysis
    • Inelastic Hinge Property Type
      Inelastic Hinge Property Type
    • Seismic Device (Damper/ Isolator)
      Seismic Device (Damper/ Isolator)

    High-Rise Building

    • High-rise Analysis
      High-rise Analysis
    • Construction Sequence
      Construction Sequence
    • Soil-Structure Interaction
      Soil-Structure Interaction
    • Column Shortening
      Column Shortening
    • Time Dependent Material
      Time Dependent Material
    • Column Shortening Graph
      Column Shortening Graph
    • Heat of Hydration Analysis
      Heat of Hydration Analysis
    • Stresses and Temperature History Graphs
      Stresses and Temperature History Graphs

    High-Rise Building

    • High-rise Analysis
      High-rise Analysis
    • Construction Sequence
      Construction Sequence
    • Soil-Structure Interaction
      Soil-Structure Interaction
    • Column Shortening
      Column Shortening
    • Time Dependent Material
      Time Dependent Material
    • Column Shortening Graph
      Column Shortening Graph
    • Heat of Hydration Analysis
      Heat of Hydration Analysis
    • Stresses and Temperature History Graphs
      Stresses and Temperature History Graphs

    Nonlinear Analysis

    • Material Nonlinear Analysis
      Material Nonlinear Analysis
    • Concrete Model
      Concrete Model
    • Steel Model
      Steel Model
    • Boundary Nonlinear Analysis
      Boundary Nonlinear Analysis
    • Nonlinear Spring
      Nonlinear Spring
    • Seismic Device(Damper/Isolator)
      Seismic Device(Damper/Isolator)
    • Geometry Nonlinear Analysis
      Geometry Nonlinear Analysis
    • Cable Element
      Cable Element
    • Buckling & P-Delta Analysis
      Buckling & P-Delta Analysis

    Nonlinear Analysis

    • Material Nonlinear Analysis
      Material Nonlinear Analysis
    • Concrete Model
      Concrete Model
    • Steel Model
      Steel Model
    • Boundary Nonlinear Analysis
      Boundary Nonlinear Analysis
    • Nonlinear Spring
      Nonlinear Spring
    • Seismic Device(Damper/Isolator)
      Seismic Device(Damper/Isolator)
    • Geometry Nonlinear Analysis
      Geometry Nonlinear Analysis
    • Cable Element
      Cable Element
    • Buckling & P-Delta Analysis
      Buckling & P-Delta Analysis