Canadian Integral Steel Composite Bridge Design

Build a two-span integral steel composite bridge with abutments and piles, apply Canadian moving loads and earth pressure, and complete CSA S6-19 design checks.

Overview

In this quest, you will model a two-span integral steel composite I-girder bridge in MIDAS CIVIL NX. Begin with the Steel Composite Bridge Wizard, then manually add integral abutments and piles, define pile-soil springs and earth-pressure loads, and modify the construction stages. You will apply Canadian moving loads and review reactions, member forces, stresses, and critical vehicle positions. Finally, you will perform steel composite girder and RC pier design checks according to CSA S6-19. By completing this quest, you will learn how to: - Generate a two-span steel composite bridge model - Model integral abutments, piles, and pier components - Define pile-soil springs and earth-pressure loads - Configure composite sections and construction stages - Apply CSA S6-19 moving loads and identify critical vehicle positions - Check shear connectors, fatigue, unbraced length, and stiffeners - Perform CSA-based steel composite girder and RC pier design checks

เอกสารประกอบ

ข้อกำหนด

  • Submit the model file based on the attached tutorial
  • Submit a document with screenshots for deformation, forces & stresses
  • Submit the design report for girder and pier generated using midas Civil NX

Certified Skills

Construction Stage AnalysisMoving Load AnalysisSteel Composite Design

ดูตัวอย่างใบรับรอง

CERTIFICATEof Completion
This is to certify thatName
has successfully completedCanadian Integral Steel Composite Bridge Design
Construction Stage AnalysisMoving Load AnalysisSteel Composite Design
ใบรับรองฉบับนี้รับรองว่าบุคคลผู้มีนามข้างต้นมีความสามารถในระดับปฏิบัติงานจริงและความเชี่ยวชาญเฉพาะทางในสาขาที่เกี่ยวข้อง Quest นี้ดำเนินการในฐานะโปรแกรมการฝึกอบรมอย่างเป็นทางการของ MIDAS IT และได้ออกใบรับรองเมื่อผ่านเกณฑ์การประเมินครบทุกข้อ