Canadian Integral Steel Composite Bridge Design

Build a two-span integral steel composite bridge with abutments and piles, apply Canadian moving loads and earth pressure, and complete CSA S6-19 design checks.

Overview

In this quest, you will model a two-span integral steel composite I-girder bridge in MIDAS CIVIL NX. Begin with the Steel Composite Bridge Wizard, then manually add integral abutments and piles, define pile-soil springs and earth-pressure loads, and modify the construction stages. You will apply Canadian moving loads and review reactions, member forces, stresses, and critical vehicle positions. Finally, you will perform steel composite girder and RC pier design checks according to CSA S6-19. By completing this quest, you will learn how to: - Generate a two-span steel composite bridge model - Model integral abutments, piles, and pier components - Define pile-soil springs and earth-pressure loads - Configure composite sections and construction stages - Apply CSA S6-19 moving loads and identify critical vehicle positions - Check shear connectors, fatigue, unbraced length, and stiffeners - Perform CSA-based steel composite girder and RC pier design checks

자료

요구사항

  • Submit the model file based on the attached tutorial
  • Submit a document with screenshots for deformation, forces & stresses
  • Submit the design report for girder and pier generated using midas Civil NX

Certified Skills

Construction Stage AnalysisMoving Load AnalysisSteel Composite Design

인증서 미리보기

CERTIFICATEof Completion
This is to certify thatName
has successfully completedCanadian Integral Steel Composite Bridge Design
Construction Stage AnalysisMoving Load AnalysisSteel Composite Design
본 인증서는 상기인이 해당 분야에서 실무 수준의 역량과 전문성을 갖추었음을 증명합니다. 본 퀘스트는 MIDAS IT의 공식 교육 프로그램으로 진행되었으며, 모든 평가 기준을 충족하여 인증서가 발급되었습니다.