Two-Span PSC Composite Bridge with Multi-Column Pier

Build a two-span PSC composite I-girder bridge with a multi-column pier, evaluate tendon losses, and complete AASHTO LRFD design and LRFR rating.

Overview

In this quest, you will model a two-span PSC composite I-girder bridge with a multi-column pier in MIDAS CIVIL NX. You will define BT-72 girder sections, time-dependent concrete properties, prestressing tendons, tapered pier caps, reinforcement, and construction stages. You will apply static and AASHTO moving loads and review reactions, deformations, beam forces, critical vehicle positions, and time-dependent tendon losses. Finally, you will perform PSC girder and multi-column pier design according to AASHTO LRFD 2020 and complete bridge rating according to AASHTO LRFR 2019. By completing this quest, you will learn how to: - Generate a two-span PSC composite bridge model - Model a multi-column pier with tapered pier-cap sections - Define prestressing tendons, reinforcement, and construction stages - Evaluate moving-load responses and tendon losses - Check flexural strength, tendon stress, and interface shear - Perform RC design and code checks for the pier columns - Complete strength and service limit-state rating checks

자료

요구사항

  • Submit the model file based on the attached tutorial
  • Submit document with screenshots for deformation, forces & stresses
  • Submit design report for PSC girder & pier generated using midas Civil NX

Certified Skills

PSC DesignRC Design

인증서 미리보기

CERTIFICATEof Completion
This is to certify thatName
has successfully completedTwo-Span PSC Composite Bridge with Multi-Column Pier
PSC DesignRC Design
본 인증서는 상기인이 해당 분야에서 실무 수준의 역량과 전문성을 갖추었음을 증명합니다. 본 퀘스트는 MIDAS IT의 공식 교육 프로그램으로 진행되었으며, 모든 평가 기준을 충족하여 인증서가 발급되었습니다.