Balanced Cantilever PSC Box Girder Bridge Design to AS 5100

Model a balanced cantilever PSC box girder bridge with staged construction and prestressing, and complete analysis and design in CIVIL NX complying with AS5100.

Overview

In this quest, you will model and design a three-span, 300 m balanced cantilever PSC box girder bridge in MIDAS CIVIL NX. Using the FCM Bridge Wizard, you will define the bridge geometry, materials, variable box sections, construction sequence, member ages, and tendon profiles. You will also configure time-dependent concrete properties, including creep, shrinkage, and compressive strength development. You will apply construction loads, temperature effects, M1600 moving loads, response spectrum loads, and support settlement. After performing construction stage and moving load analyses, you will evaluate girder stresses, deformations, tendon losses, stress history, and FCM camber. Finally, you will generate load combinations based on AS 5100.2:2017 and complete the PSC box girder design and reporting in accordance with AS 5100.5:2017. By completing this quest, you will be able to: - Build a balanced cantilever PSC bridge using the FCM Wizard. - Define tendons and time-dependent concrete properties. - Simulate the bridge construction sequence. - Evaluate construction-stage behavior, tendon losses, and camber. - Perform PSC design and generate a detailed design report.

자료

요구사항

  • Submit the model generated as per the attached tutorial
  • Submit a document with screenshots for deflection, forces & camber plots
  • Submit PSC design report for span mid box girder section

Certified Skills

PSC Box GirderConstruction Stage AnalysisPSC DesignResponse Spectrum

인증서 미리보기

CERTIFICATEof Completion
This is to certify thatName
has successfully completedBalanced Cantilever PSC Box Girder Bridge Design to AS 5100
PSC Box GirderConstruction Stage AnalysisPSC DesignResponse Spectrum
본 인증서는 상기인이 해당 분야에서 실무 수준의 역량과 전문성을 갖추었음을 증명합니다. 본 퀘스트는 MIDAS IT의 공식 교육 프로그램으로 진행되었으며, 모든 평가 기준을 충족하여 인증서가 발급되었습니다.