Two-Span PSC Composite Bridge with Multi-Column Pier

Build a two-span PSC composite I-girder bridge with a multi-column pier, evaluate tendon losses, and complete AASHTO LRFD design and LRFR rating.

Overview

In this quest, you will model a two-span PSC composite I-girder bridge with a multi-column pier in MIDAS CIVIL NX. You will define BT-72 girder sections, time-dependent concrete properties, prestressing tendons, tapered pier caps, reinforcement, and construction stages. You will apply static and AASHTO moving loads and review reactions, deformations, beam forces, critical vehicle positions, and time-dependent tendon losses. Finally, you will perform PSC girder and multi-column pier design according to AASHTO LRFD 2020 and complete bridge rating according to AASHTO LRFR 2019. By completing this quest, you will learn how to: - Generate a two-span PSC composite bridge model - Model a multi-column pier with tapered pier-cap sections - Define prestressing tendons, reinforcement, and construction stages - Evaluate moving-load responses and tendon losses - Check flexural strength, tendon stress, and interface shear - Perform RC design and code checks for the pier columns - Complete strength and service limit-state rating checks

Materials

Requirements

  • Submit the model file based on the attached tutorial
  • Submit document with screenshots for deformation, forces & stresses
  • Submit design report for PSC girder & pier generated using midas Civil NX

Certified Skills

PSC DesignRC Design

Preview Certificate

CERTIFICATEof Completion
This is to certify thatName
has successfully completedTwo-Span PSC Composite Bridge with Multi-Column Pier
PSC DesignRC Design
This certificate verifies that the above individual has demonstrated practical-level competency and professional expertise in the relevant field. This quest was conducted as an official MIDAS IT educational program, and the certificate was issued upon meeting all evaluation criteria.